Grand County. A builder is listed when their home city is Moab, or when their service area names Moab, Grand County, the Wasatch Front, or statewide work.

Moab fee note · Compare city rules

Builders

Moab rules

Last verified November 15, 2026.

Adopted. Chapter 17.70, current through Ordinance 26-22 (September 22, 2026). The ADU sections still cite Ordinance 21-16 (2021).

Type 1 is an external unit. Type 2 is an internal unit with optional owner occupancy. Type 3 is an internal unit that requires an owner-occupied primary dwelling. Type 1 and Type 2 are described as intended for active-employment households. Type 3 is permitted to the extent state statute requires. The stated intent is that ADUs not be used as second homes.

Type 1 units are a permitted use in RA-1, R-1, R-2, R-3, and R-4. No lot-size minimum is stated in §17.70.030. Side and rear setbacks may be reduced to 5 feet if height does not exceed 20 feet. Separation from adjacent structures is 10 feet, which the building official may modify if fire separation is otherwise achieved. Maximum size is 1,200 square feet, or 1,500 square feet on lots larger than 20,000 square feet. Lots larger than 20,000 square feet may apply for a maximum of two ADUs.

A Type 1 unit above a garage may not be more than one story above the ground floor and may not protrude beyond a ground-floor wall. Overall height is 30 feet if zone setbacks are met, or 20 feet if the structure uses accessory-structure setbacks and encroaches into the zone’s side and rear setbacks. Parking is one additional on-site space. Tandem is allowed if the driveway is longer than 35 feet from the property line. On a duplex, one of the three resulting units must be owner-occupied.

Type 2 and Type 3 internal units are permitted in the same zones. Bedroom egress is required. One additional parking space uses the same tandem rule. There is no maximum size. They are not allowed if the main dwelling is on a failing septic tank or on a lot with a duplex. Type 3 requires the primary dwelling to be owner-occupied.

A zoning compliance letter is required before the building permit. A deed restriction is recorded with the County Recorder. The ADU may not be sold separately.

Fees not published; contact the city.

Not yet verified

  • The same official sections say both a 30-day rental minimum and, in the Type 1 deed-restriction form, a three-month minimum lease. Which term the city is administering is not yet verified.
  • Whether Moab is a specified municipality under Utah Code §10-21-101 was not certified from a current official city-class list. That status is not yet verified.
  • Fee amounts are not yet verified.

Utah baseline

Plain-language reading of the state code, checked against the Utah Legislature site on November 15, 2026. It is not a city ordinance and it is not legal advice.

Internal ADUs

  • In an area zoned primarily for residential use, an internal accessory dwelling unit is a permitted use.
  • Except for the limits the statute lists, a municipality may not restrict that one internal unit by its size relative to the primary dwelling, by total lot size, by street frontage, or by internal connectivity.
  • The unit still has to meet applicable building, health, and fire codes. Cities keep specific powers in the statute, including some parking, appearance, short-term rental, owner-occupancy, septic, and small-lot rules.
  • H.B. 82 (2021) created this framework. The municipal text now in effect is Utah Code § 10-21-303, effective November 6, 2025.

Detached ADUs

  • Effective October 1, 2026, Utah Code § 10-21-304 requires a specified municipality to allow a detached accessory dwelling unit on a lot or parcel of at least 11,000 square feet that already has a single-family dwelling as a permitted use.
  • The statute does not stop a city from allowing a detached unit on a smaller lot.
  • The local rule has to require compliance with building, health, and fire codes, and it has to include a path to convert a legally built accessory structure.
  • In a primarily residential zone the city may not require a conditional use permit. Parking assigned to the unit is capped at one space under 650 square feet and two spaces at 650 square feet or larger.
  • Cities may still set size, height, coverage, setbacks, design consistency with the house, owner occupancy, a 90-day minimum rental, one accessory dwelling unit per lot, and utility-access limits. Development agreements signed on or before May 6, 2026, are not overridden.
  • “Specified municipality” is defined in Utah Code § 10-21-101: a city of the first, second, third, or fourth class, or a fifth-class city of 5,000 or more people in a first-, second-, or third-class county. Confirm whether a particular city is covered before you rely on the floor.