Skip to content
Utah ADU Hub
Menu

Cities

ADU builders in Pleasant Grove, Utah

Utah County. A builder is listed when their home city is Pleasant Grove, or when their service area names Pleasant Grove, Utah County, the Wasatch Front, or statewide work.

Pleasant Grove fee note · Compare city rules

Builders

Allegiant Construction

builder · HQ city not verified

DOPL Verified

Service area: Murray, Layton, West Jordan, Ogden, Bountiful, SLC (city pages); Also serves (builder site, 2026-11-16): West Valley City, Eagle Mountain, Herriman, Saratoga Springs, Logan, Riverton, Syracuse, Roy, Pleasant Grove, Midvale, Springville, Clearfield, Kaysville, Cottonwood Heights, South Salt Lake, Farmington

Grandview Contractors

builder · Provo

DOPL Verified

Service area: Utah County / Wasatch Front; Also serves (builder site, 2026-11-16): West Valley City, Eagle Mountain, Herriman, Saratoga Springs, Taylorsville, Riverton, Pleasant Grove, Midvale, Springville, Cottonwood Heights

Ironwood Custom Builders

builder · Cottonwood Heights

DOPL Verified

Service area: Lehi/Utah County ADU page; Also serves (builder site, 2026-11-16): Herriman, Taylorsville, Riverton, Midvale, Cottonwood Heights

Lift Construction

builder · Syracuse

DOPL Verified

Service area: Northern Utah; Also serves (builder site, 2026-11-16): West Valley City, Eagle Mountain, Saratoga Springs, Taylorsville, Riverton, Syracuse, Roy, Pleasant Grove, Kaysville, Farmington

Outlook Builders

builder · Salt Lake City (per site; address not verified)

DOPL Verified

Service area: SLC, Provo, Orem, Lehi, Sandy (city pages); Also serves (builder site, 2026-11-16): West Valley City, Eagle Mountain, Herriman, Saratoga Springs, Taylorsville, Riverton, Syracuse, Pleasant Grove, Midvale, Springville, Clearfield, Kaysville, Cottonwood Heights, Farmington

PANDEN Construction

builder · Lehi

DOPL Verified

Service area: Utah, Salt Lake, Weber counties and Park City; Also serves (builder site, 2026-11-16): Eagle Mountain, Herriman, Saratoga Springs, Riverton

Pleasant Grove rules

Last verified November 17, 2026.

Source-checked against Pleasant Grove Code 10-15-47 and Ordinance 2026-030, adopted October 6, 2026. Detached dimensions below are the R-1 accessory-building rules that 10-15-47 defers to. Confirm with the city that those rules apply to the ADU.

Internal and detached ADUs are allowed in A-1, R-R, R-1, RM-7, DV, and the Grove mixed-housing zones. They are not allowed in multifamily zones or on a lot that cannot meet the parking rule. No ADU-specific lot minimum is stated. One per lot. The second address is “unit B.” Separate meters are allowed. A tiny home on a permanent foundation is allowed.

Detached standards come from the R-1 accessory-building rules, because 10-15-47 defers to zone standards. Confirm with the city. The unit sits in a rear or interior side yard, at least 6 feet from the house and 3 feet from the property line. Height is the lesser of 25 feet or the house height. Above 12 feet, add 1 foot of setback per extra foot of height. Size is at most 15% of the zone’s minimum lot area and smaller than the house footprint, excluding the garage. Over 500 sq ft, materials must match the house. Total lot coverage is 40%.

Parking under Ordinance 2026-030: an internal ADU needs no extra space if the house already has 4 off-street spaces, and otherwise needs 1. A detached ADU needs 1 space under 650 sq ft and 2 spaces at 650 sq ft or more.

The owner must occupy either the house or the detached unit. The ordinance states 50%-equity, trust, and LLC ownership rules. A minimum rental term is not stated. Registration is $25, plus building-permit fees.

Registration is $25, plus building-permit fees. Ordinance 2026-030 notice

Not yet verified

  • 10-15-47 defers detached dimensions to zone standards. The R-1 accessory-building numbers above are flagged for confirmation with the city.
  • A minimum rental term is not stated.

Utah baseline

Plain-language reading of the state code, checked against the Utah Legislature site on November 15, 2026. It is not a city ordinance and it is not legal advice.

Internal ADUs

  • In an area zoned primarily for residential use, an internal accessory dwelling unit is a permitted use.
  • Except for the limits the statute lists, a municipality may not restrict that one internal unit by its size relative to the primary dwelling, by total lot size, by street frontage, or by internal connectivity.
  • The unit still has to meet applicable building, health, and fire codes. Cities keep specific powers in the statute, including some parking, appearance, short-term rental, owner-occupancy, septic, and small-lot rules.
  • H.B. 82 (2021) created this framework. The municipal text now in effect is Utah Code § 10-21-303, effective November 6, 2025.

Detached ADUs

  • Effective October 1, 2026, Utah Code § 10-21-304 requires a specified municipality to allow a detached accessory dwelling unit on a lot or parcel of at least 11,000 square feet that already has a single-family dwelling as a permitted use.
  • The statute does not stop a city from allowing a detached unit on a smaller lot.
  • The local rule has to require compliance with building, health, and fire codes, and it has to include a path to convert a legally built accessory structure.
  • In a primarily residential zone the city may not require a conditional use permit. Parking assigned to the unit is capped at one space under 650 square feet and two spaces at 650 square feet or larger.
  • Cities may still set size, height, coverage, setbacks, design consistency with the house, owner occupancy, a 90-day minimum rental, one accessory dwelling unit per lot, and utility-access limits. Development agreements signed on or before May 6, 2026, are not overridden.
  • “Specified municipality” is defined in Utah Code § 10-21-101: a city of the first, second, third, or fourth class, or a fifth-class city of 5,000 or more people in a first-, second-, or third-class county. Confirm whether a particular city is covered before you rely on the floor.

Get Utah ADU rule changes and new builder listings

Email and an optional city. We store the signup the same way we store quote requests. We do not send email yet. Privacy policy.