Build-Small
builder / modular · Provo
Service area: Utah (city pages: SLC, Provo, Ogden, St. George, Park City, Logan)
Utah County. A builder is listed when their home city is Provo, or when their service area names Provo, Utah County, the Wasatch Front, or statewide work.
Provo fee note · Compare city rules
builder / modular · Provo
Service area: Utah (city pages: SLC, Provo, Ogden, St. George, Park City, Logan)
builder / modular · Lehi
Service area: Utah County; Also serves (builder site, 2026-11-16): Saratoga Springs
builder · Provo
Service area: Utah County / Wasatch Front; Also serves (builder site, 2026-11-16): West Valley City, Eagle Mountain, Herriman, Saratoga Springs, Taylorsville, Riverton, Pleasant Grove, Midvale, Springville, Cottonwood Heights
builder · Cottonwood Heights
Service area: Lehi/Utah County ADU page; Also serves (builder site, 2026-11-16): Herriman, Taylorsville, Riverton, Midvale, Cottonwood Heights
builder · Orem
Service area: Utah County; Also serves (builder site, 2026-11-16): Pleasant Grove, Springville
builder · Utah County (HQ city not verified)
Service area: Spanish Fork, Provo, Lehi, Orem mentioned; Also serves (builder site, 2026-11-16): Pleasant Grove, Springville
prefab / modular · Salt Lake City
Service area: Utah statewide
builder · Salt Lake City (per site; address not verified)
Service area: SLC, Provo, Orem, Lehi, Sandy (city pages); Also serves (builder site, 2026-11-16): West Valley City, Eagle Mountain, Herriman, Saratoga Springs, Taylorsville, Riverton, Syracuse, Pleasant Grove, Midvale, Springville, Clearfield, Kaysville, Cottonwood Heights, Farmington
builder · Lehi
Service area: Utah, Salt Lake, Weber counties and Park City; Also serves (builder site, 2026-11-16): Eagle Mountain, Herriman, Saratoga Springs, Riverton
builder · Heber City
Service area: SLC, Park City, Utah County
builder · American Fork
Service area: Utah County; Also serves (builder site, 2026-11-16): Pleasant Grove
builder · HQ city not verified
Service area: Provo, Park City, SLC, Ogden mentioned
Last verified November 17, 2026.
Adopted. Chapter 14.30 as replaced by Ordinance 2026-40, November 3, 2026, 6–0. The new text is not yet in the online code.
Allowed zones are RA, R1, R2, VLDR, LDR, MDR, HDR, CR, and RM (14.30.015 and 14.30.020(1)). Prohibited: the Broadview Shores Overlay, and areas east of I-15 in the RM, R16–R110, and R2PD zones, including the Performance Development overlay (14.30.020(2)). An exceptions map is in 14.30.020(3).
An ADU may be over an attached garage, inside the house, in an addition, or detached in the rear or side yard (14.30.030).
Permitted zones have no lot minimum. On an otherwise prohibited lot, a detached ADU is allowed if the lot is at least 11,000 square feet, the zone allows a single-family dwelling, and a single-family home is already on the lot (14.30.020(4)).
Height and footprint must be smaller than the main house. The minimum size is 200 square feet. All structures together may not cover more than 40 percent of the parcel. A 14.30.020(4) unit must also be under 25 feet and under the height of the house.
Setbacks are 10 feet from any property line, or the house’s existing setback on that line, whichever is less. A 14.30.020(4) unit uses the zone’s side and rear setbacks plus 1 foot for each foot of height over 16 feet.
Parking is 4 off-street spaces, and 2 of them may be tandem. A detached ADU needs only the state maximum: 2 spaces if it is 650 square feet or larger, and 1 space if it is smaller.
The owner must occupy the property. A temporary absence of up to 3 years is allowed. ADU occupancy is a maximum of 3 adults plus minor children.
A rental dwelling license is required, with a deed restriction and annual renewal. The license expires on sale. Short-term rentals of less than 1 month are unlawful in residential and agricultural zones.
The adopted text is from the November 3, 2026 council packet and is not yet codified online. The city ADU page still shows the older 4-space parking text.
Fees conflict. The city ADU page says $50 one-time plus $20 per year for a rental license. The fee schedule says $100 for a single unit and $500 for multiple units. Detached ADUs pay impact fees; those amounts are not stated. Check the city fee schedule. Provo community development fee schedule
Plain-language reading of the state code, checked against the Utah Legislature site on November 15, 2026. It is not a city ordinance and it is not legal advice.