Advanced Building Concepts
builder · Holladay
Service area: Salt Lake County
Salt Lake County. A builder is listed when their home city is Sandy, or when their service area names Sandy, Salt Lake County, the Wasatch Front, or statewide work.
Sandy fee note · Compare city rules
builder · Holladay
Service area: Salt Lake County
builder · Sandy
Service area: ~20 city pages, Salt Lake & Utah valleys
builder · Sandy
Service area: Northern Utah
builder · Provo
Service area: Utah County / Wasatch Front; Also serves (builder site, 2026-11-16): West Valley City, Eagle Mountain, Herriman, Saratoga Springs, Taylorsville, Riverton, Pleasant Grove, Midvale, Springville, Cottonwood Heights
prefab / modular · Salt Lake City
Service area: Utah statewide
builder · Salt Lake City (per site; address not verified)
Service area: SLC, Provo, Orem, Lehi, Sandy (city pages); Also serves (builder site, 2026-11-16): West Valley City, Eagle Mountain, Herriman, Saratoga Springs, Taylorsville, Riverton, Syracuse, Pleasant Grove, Midvale, Springville, Clearfield, Kaysville, Cottonwood Heights, Farmington
builder · Lehi
Service area: Utah, Salt Lake, Weber counties and Park City; Also serves (builder site, 2026-11-16): Eagle Mountain, Herriman, Saratoga Springs, Riverton
builder · Draper
Service area: Draper / Salt Lake County
builder · Sandy
Service area: Sandy, Draper, Layton and others; Also serves (builder site, 2026-11-16): Eagle Mountain, Herriman, Taylorsville, Riverton, Kaysville, Cottonwood Heights, Farmington
Last verified November 15, 2026.
Adopted in signed Ordinance 26-55, which amends Title 21 as set forth in Exhibit A. The signature block shows September 15, 2026, and DocuSign dates of September 21, 2026. Effective upon publication of a summary. Exhibit B, the clean attachment, does not match the signed Exhibit A table.
Attached and detached ADUs are allowed on a lot in a single-family residential zone that has not more than one single-family dwelling, or where a building permit for that dwelling is already in process (§21-11-1(b)). An ADU needs an administrative special-use permit and a business license (§21-11-1(c)(2)). In the residential use matrix, an accessory dwelling unit (attached or detached) is a special use (S) in the R-1 districts and is not allowed (N) in the MH district.
Only one ADU, attached or detached, may be operated at a time (§21-11-1(e)(1)). Only one detached self-contained habitable unit, either an ADU or an extended living area, is allowed on the property.
The owner must live in the primary dwelling or the ADU as their primary residence (§21-11-1(d)(2)). The fee-title owner must be an individual, or the trustor of a family trust with at least 50 percent ownership. A corporation, partnership, limited liability company, or similar entity may not be the fee-title owner.
An attached ADU must keep the appearance of a single-family house (§21-11-1(f)). Only one primary entrance may face the street. Other entrances are on the side, in the rear, or inside the house or garage. An addition must share a common wall at least 20 percent of the addition’s perimeter and may not connect only by a breezeway or non-habitable space. A doorway between the house and the attached ADU is not required. Ordinance 26-55 does not set a maximum floor area or a separate setback table for an attached ADU.
A detached ADU or detached extended living area must be on a lot of at least 11,000 square feet (§21-11-1(g)(8)). It sits in the rear or side yard, behind the front plane of the house. On a lot of at least 40,000 square feet it may sit in the front yard if it meets the primary dwelling’s front and side setbacks in the underlying zone (LDC 21-20-2). It must be on a permanent foundation. Trailers, recreational vehicles, and other wheeled portable structures are not allowed.
Detached size, whichever is less (§21-11-1(g)(8)): total gross area no more than 2,000 square feet; footprint no larger than 75 percent of the primary dwelling footprint; and footprint no larger than the accessory-structure maximum in LDC 21-11-2(a)(2). At 15 feet or less, the side and rear setback is at least 10 feet. Up to 1.5 stories and 18 feet, and no taller than the primary dwelling, the setbacks are those of the primary dwelling in the underlying zone, and never less than 10 feet. The setback from the primary dwelling is at least 6 feet.
Detached parking (§21-24-4(a)(1) and §21-24-8(b)) is one space if the unit is under 650 square feet and two spaces if it is 650 square feet or greater. The single-family dwelling still needs its two-car garage and guest parking. If creating the ADU removes required parking, that parking is replaced on site (§21-11-1(e)(4)). The signed Exhibit A does not add a stall count for an attached ADU beyond Chapter 21-24.
An attached ADU may not be rented for less than 30 consecutive days unless the property has short-term-rental approval under §21-11-26 (§21-11-1(f)(2)). A detached unit may not be rented for less than 30 consecutive days (§21-11-1(g)(2)); that subsection does not include the §21-11-26 exception. A legal accessory structure built before October 1, 2026 may be converted to a detached ADU if it meets this section and the fire, building, and health codes, and the conversion may not eliminate required parking stalls (§21-11-1(h)).
Fees not published; contact the city.
Plain-language reading of the state code, checked against the Utah Legislature site on November 15, 2026. It is not a city ordinance and it is not legal advice.