Skip to content
Utah ADU Hub
Menu

Cities

ADU builders in Spanish Fork, Utah

Utah County. A builder is listed when their home city is Spanish Fork, or when their service area names Spanish Fork, Utah County, the Wasatch Front, or statewide work.

Spanish Fork fee note · Compare city rules

Builders

Grandview Contractors

builder · Provo

DOPL Verified

Service area: Utah County / Wasatch Front; Also serves (builder site, 2026-11-16): West Valley City, Eagle Mountain, Herriman, Saratoga Springs, Taylorsville, Riverton, Pleasant Grove, Midvale, Springville, Cottonwood Heights

Ironwood Custom Builders

builder · Cottonwood Heights

DOPL Verified

Service area: Lehi/Utah County ADU page; Also serves (builder site, 2026-11-16): Herriman, Taylorsville, Riverton, Midvale, Cottonwood Heights

PANDEN Construction

builder · Lehi

DOPL Verified

Service area: Utah, Salt Lake, Weber counties and Park City; Also serves (builder site, 2026-11-16): Eagle Mountain, Herriman, Saratoga Springs, Riverton

Spanish Fork rules

Last verified November 17, 2026.

Current through Ordinance 14-2026, August 18, 2026. Municipal Code 15.3.24.090(A) and (E). Email from Spanish Fork Community Development, November 16, 2026, pointed to those subsections.

Internal and detached ADUs are allowed. One ADU is allowed per parcel, in the house or in a permanent accessory structure. A recreational vehicle does not qualify. The zones are R-3, R-1-6, R-1-8, R-1-9, R-1-12, R-1-15, R-1-20, R-1-30, R-1-40, R-1-60, R-1-80, and R-R (15.3.24.090).

The lot minimum is 6,000 square feet. A detached ADU on a parcel under 1 acre may have no more than 1,000 square feet of habitable space. No internal size cap is stated. All detached accessory structures together may not exceed 15 percent of the lot area inside the main-building setbacks, or 10 percent elsewhere.

Detached height is 20 feet to the peak. Over 15 feet, the roof needs at least a 2/12 pitch. On a lot over half an acre, height may reach 24 feet if the rear and side setbacks equal the height. A structure that meets the main-building setbacks may reach the zone maximum.

Setbacks are at least 5 feet from all property lines and from other structures. The unit must sit behind the house’s front wall plane and meet the house’s front setback. On a parcel of 1 acre or more, the main-structure setbacks apply.

Tandem parking is not allowed. An internal ADU needs 3 spaces total (2 for the house and 1 for the ADU). A detached ADU under 650 square feet needs 3 total. A detached ADU of 650 square feet or more needs 4 total (2 for the house and 2 for the ADU).

The owner must reside on the property. After one year of residence, occupancy can be suspended for a temporary absence of up to 3 years or a stay in a care facility. Registration with Community Development is required. Minimum rental term: not stated.

The city ADU page still says an external ADU needs 4 spaces. That page is stale after Ordinance 14-2026. The code governs.

The city ADU page lists a $60 per year registration through CitizenServe. It also says impact fees are not charged and separate meters are not required. Spanish Fork ADU page

Utah baseline

Plain-language reading of the state code, checked against the Utah Legislature site on November 15, 2026. It is not a city ordinance and it is not legal advice.

Internal ADUs

  • In an area zoned primarily for residential use, an internal accessory dwelling unit is a permitted use.
  • Except for the limits the statute lists, a municipality may not restrict that one internal unit by its size relative to the primary dwelling, by total lot size, by street frontage, or by internal connectivity.
  • The unit still has to meet applicable building, health, and fire codes. Cities keep specific powers in the statute, including some parking, appearance, short-term rental, owner-occupancy, septic, and small-lot rules.
  • H.B. 82 (2021) created this framework. The municipal text now in effect is Utah Code § 10-21-303, effective November 6, 2025.

Detached ADUs

  • Effective October 1, 2026, Utah Code § 10-21-304 requires a specified municipality to allow a detached accessory dwelling unit on a lot or parcel of at least 11,000 square feet that already has a single-family dwelling as a permitted use.
  • The statute does not stop a city from allowing a detached unit on a smaller lot.
  • The local rule has to require compliance with building, health, and fire codes, and it has to include a path to convert a legally built accessory structure.
  • In a primarily residential zone the city may not require a conditional use permit. Parking assigned to the unit is capped at one space under 650 square feet and two spaces at 650 square feet or larger.
  • Cities may still set size, height, coverage, setbacks, design consistency with the house, owner occupancy, a 90-day minimum rental, one accessory dwelling unit per lot, and utility-access limits. Development agreements signed on or before May 6, 2026, are not overridden.
  • “Specified municipality” is defined in Utah Code § 10-21-101: a city of the first, second, third, or fourth class, or a fifth-class city of 5,000 or more people in a first-, second-, or third-class county. Confirm whether a particular city is covered before you rely on the floor.

Get Utah ADU rule changes and new builder listings

Email and an optional city. We store the signup the same way we store quote requests. We do not send email yet. Privacy policy.